Shop Progress

The concrete went in on October 16th. It was sealed on October 17th. After the seal dried I took these photos.

The roof ridge cap was a pain as it took a while to figure out how to anchor the body harness so Dear could work with that safety net while on the steel roof. Finally this past Sunday with the help of our son they managed to get the 4 sections of ridge cap installed and drilled onto the roof.

The view from below of the first section of the ridge cap in place with three more to go.

You can understand my relief for Dear to have this part of the job behind him.

Thank you to Dan who made the work go smoothly and quicker than having Dear working on his own.

Little by little it’s coming together. Today he is working on installing the windows. Soon the steel side panels can be installed. Still hoping to have it enclosed before our next big snow!